Latin American and Caribbean countries have signed almost 700 investment agreements. They have been targeted in almost 300 investor-state disputes.

Argentina has faced almost 62 ISDS cases, about 6% of all cases, making it the world’s most targeted state. Venezuela and Mexico have been among the ten most frequent respondents in the world, with 51 and 33 cases, respectively.

Many key cases such as Renco vs. Peru, Chevron vs. Ecuador or Pac Rim vs. El Salvador have originated in significant environmental damages caused by corporations. Philip Morris took an ISDS case against Uruguay over its anti-tobacco law.

Chile, Mexico and Peru are also party to the Trans-Pacific Partnership (TPP) with eight other Pacific Rim states. The TPP includes an investor-state dispute mechanism that undermines public-interest ‘safeguards’.

The most well-known cases ISDS cases in the region include:

Chevron (US) vs. Ecuador: For 26 years, Texaco, later acquired by Chevron, performed oil operations in Ecuador. Ecuadorian courts found that during that period the company dumped billions of gallons of toxic water and dug hundreds of open-air oil sludge pits in Ecuador’s Amazon, poisoning the communities of some 30,000 Amazon residents. After a legal battle spanning two decades, in November 2013, Ecuador’s highest court ordered the corporation to pay $9.5 billion to provide desperately needed clean-up and health care to afflicted indigenous communities. Chevron challenged the decisions produced by Ecuador’s domestic legal system before an ISDS tribunal. In 2018, the arbitration tribunal held that the $9.5 billion judgment was fraudulent, violated international public policy and should not be recognised or enforced by the courts of other States. The amount of the award has not been established yet. (Ecuador-United States BIT invoked)

Occidental Petroleum Corporation “Oxy” (US) vs. Ecuador: in 2012 Ecuador was ordered to pay US$1.77 billion to the investor, an oil exploration and production company, for breach of contract. Sentence was reduced to US$1 billion in November 2015 (Ecuador-United States BIT invoked).

Investors vs. Argentina: When Argentina froze its utility rates in response to its 2001-2002 financial crisis, it was hit by over 40 lawsuits from investors, including Suez & Vivendi (France), Sociedad General de Aguas de Barcelona S.A (Spain) and Anglian Water (UK). The ISDS tribunal concluded that Argentina had breached the investors’ right to fair and equitable treatment. By 2014, the country had been ordered to pay a total of US$980 million (various BITs invoked).

Photo: Sairen42 / CC BY-SA 3.0

(April 2020)

Zone Bourse | 17-Apr-2023
La société d’investissement mexicaine JLL Capital, dont les activités au Honduras sont bloquées depuis 2018 dans le cadre d’un litige local, réclame quelque 380 millions de dollars au pays d’Amérique centrale dans le cadre d’une procédure d’arbitrage.
Reuters | 17-Apr-2023
Mexican investment firm JLL Capital, whose Honduran operation has been blocked since 2018 in a local dispute, is seeking some $380 million from the Central American country in arbitration proceedings.
CIAR Global | 6-Apr-2023
El arbitraje entre la compañía chilena Codelco y el Gobierno de Ecuador por las diferencias relacionadas con el proyecto minero de cobre y molibdeno Llurimagua registra un nuevo episodio en tribunales ecuatorianos
Prospera | 6-Apr-2023
US investors Honduras Próspera Inc. and its affiliates filed claims with the International Centre for Settlement of Investment Disputes against the State of Honduras.
CIAR Global | 3-Apr-2023
La minera Lecacy Vulcan ha aumentado el reclamo original al Gobierno de México en el arbitraje de inversiones presentado ante el CIADI a 1.900 millones de US dólares.
teleSUR | 28-Mar-2023
The President of Venezuela signed with the Minister of Commerce, Industry and Tourism of Colombia an agreement for the promotion and protection of investments between both nations.
La Jornada | 28-Mar-2023
Animadas por bufetes de abogados que actúan como aves de carroña, empresas trasnacionales, principalmente mineras, tratan de sacarle el último jugo al viejo TLCAN.
UDAPT | 27-Mar-2023
Aunque los tribunales holandeses aún no han emitido un fallo definitivo sobre el recurso de anulación presentado por la Fiscalía General del Estado, el Gobierno de Ecuador ya está cumpliendo el laudo arbitral como si estuviera en vigor.
UDAPT | 24-Mar-2023
Although the Dutch courts have yet to issue a final ruling on the appeal for annulment filed by the State Attorney’s Office, the Government of Ecuador is already complying with the arbitration award as if it were in force.
CIAR Global | 20-Mar-2023
El Gobierno de Panamá y Minera Panamá han acordado el texto final del contrato de concesión para el proyecto Cobre Panamá.